
Rev. 3.02
- 82 -
SRP-270
8-8-2-5 Main assembling - #2
Name of Parts Method and Procedure
①GEAR REDUCTION A
②GEAR REDUCTION B
③RIBBON FEEDER ASSY
④GEAR REDUCTION “C”
⑤LEVER RIBBON FEED ASSY
⑥WASHER (ø 2.6*5*0.5, 2EA)
⑦MAIN PCB ASSY
⑧FPC CONNECTOR
⑨SCREW MACHINE (M3*4)
⑩CARRIAGE HEAD ASSY
⑪BELT SYNCHRONUOS
⑫SPRING LEVER TENSION BELT
1. Set FRAME MAIN on the JIG.
2. Set ①GEAR REDUCTION A, GEAR REDUCTION B② ,
RIBBON FEEDER ASSY ③ and GEAR REDUCTION "C"④
onto SHAFT sequentially. Grease teeth and upper face of
RIBBON FEED ASSY.
3. Insert LEVER RIBBON FEED ASSY ⑤ and WASHER⑥ .
4. Attach FPC CONNECTOR to⑧ MAIN PCB A⑦ SSY. Next,
plug SOLENOID WIRE (block) in connecter 2p. And then, set
it to M/F and tighten two SCREW MACHINE⑨ .
5. Insert BELT SYNCHRONUOS into ⑪ CARRIAGE HEAD ⑩
ASSY, and then, belt up round PULLEY and GEAR PULLEY.
6. Hoot SPRING LEVER TENSION BELT⑫ .
<Check Point>
Check the tear of FPC.