A SERVICE OF

logo

Rev. 3.02
- 82 -
SRP-270
8-8-2-5 Main assembling - #2
Name of Parts Method and Procedure
GEAR REDUCTION A
GEAR REDUCTION B
RIBBON FEEDER ASSY
GEAR REDUCTION “C”
LEVER RIBBON FEED ASSY
WASHER (ø 2.6*5*0.5, 2EA)
MAIN PCB ASSY
FPC CONNECTOR
SCREW MACHINE (M3*4)
CARRIAGE HEAD ASSY
BELT SYNCHRONUOS
SPRING LEVER TENSION BELT
1. Set FRAME MAIN on the JIG.
2. Set GEAR REDUCTION A, GEAR REDUCTION B ,
RIBBON FEEDER ASSY and GEAR REDUCTION "C"
onto SHAFT sequentially. Grease teeth and upper face of
RIBBON FEED ASSY.
3. Insert LEVER RIBBON FEED ASSY and WASHER .
4. Attach FPC CONNECTOR to MAIN PCB A SSY. Next,
plug SOLENOID WIRE (block) in connecter 2p. And then, set
it to M/F and tighten two SCREW MACHINE .
5. Insert BELT SYNCHRONUOS into CARRIAGE HEAD
ASSY, and then, belt up round PULLEY and GEAR PULLEY.
6. Hoot SPRING LEVER TENSION BELT .
<Check Point>
Check the tear of FPC.