![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/f/81/f811195e-7ea3-4529-a537-7994a31dbe6f/f811195e-7ea3-4529-a537-7994a31dbe6f-bg63.png)
4021192 Rev A 99
Front Panel LED Status Indicator Functions
Front Panel LED Status Indicator Functions
Initial Power Up, Calibration, and Registration (AC Power applied)
The following chart illustrates the sequence of steps and the corresponding
appearance of the residential gateway front panel LED status indicators during
power up, calibration, and registration on the network when AC power is applied to
the residential gateway. Use this chart to troubleshoot the power up, calibration, and
registration process of your residential gateway.
Note: After the residential gateway completes Step 11 (Telephone Registration
Complete), the modem proceeds immediately to Normal Operations. See Normal
Operations (AC Power applied) (on page 101).
Front Panel LED Status Indicators During Initial Power Up, Calibration, and Registration
Part 1, High Speed Data Registration
Request High
Speed Data
Provisioning File