![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/f/20/f20e907b-1d42-4e61-9326-97875be3ed81/f20e907b-1d42-4e61-9326-97875be3ed81-bg64.png)
1 Power supply retaining screws
2 Power supply assembly
7. If you are instructed to return the power supply, follow all packaging instructions,
and use any packaging materials that are supplied to you for shipping.
Installing a power supply
To install a power supply, do the following:
Note: Approximately 1 to 3 minutes after the server is connected to ac power, the
power-control button becomes active.
1. Align the screw holes in the power-supply-cage pivot bracket with the
corresponding screw holes on the rear of the chassis.
82 ThinkServer TD200 Types 3724, 3808, 3809, 3815, 3817, 3824, 3826, 3836: Installation and User Guide