
Initial Pump Set-Up 7 Operation
44 User Manual RKP-II (CA53461-001; Version 1.0, 10/07) © 2007 Moog GmbH
7.1.1 Filling up the Pump
Filling up the Pump
Procedure:
1. Fill the pump through the leakage oil port with operating fluid
completely.
7.1.2 Adjusting the Compensator
Adjusting the
Compensator
The following information is the same for F, H, J and R compensators:
Tightening torque for the lock nuts of the adjusting screw for adjusting the
compensator pressure: SW 19 = 10 Nm + 5 Nm
Procedure:
1. Depending on the compensator, refer to the respective subchapter.
2. If required: Adjust the compensator according to the information provided
in the subchapter.
3. For G compensators: Adjust the compensator using the lockable
adjustment knob.
7.1.2.1 Hydraulically Driven Remote Pressure
Compensator, H1
WARNING Risk of injury and property damage as a result of fire!
Easily inflammable operating fluid may cause fire.
• Keep the pump away from any open flames.
WARNING Risk of Burns!
Pump parts run hot while in operation.
• Do not touch the pump while it is running.
WARNING Risk of injury and property damage as a result of
engaging or winding!
Freely accessible rotating machine / equipment parts may lead
to severe injuries or property damage as a result of engaging
or winding.
• Use suitable protective devices to ensure that access to
the drive shaft is blocked.
The pump must be completely filled with operating fluid before initial
operation.
Information on the compensator functions:
Ö Chap. "3.5 Compensator Operation", Page 15
All compensators are pre-set at the factory. In this section, information on
the parameters needed to adjust the compensators is provided.
Information on the compensator:
Ö Chap. "3.5.2 Hydraulically Driven Remote Pressure Compensator, H1",
Page 17