Install SpectraLink 6000 System
Survey Site
Check the site to be sure pre-installation work has been completed
correctly. This includes:
Location chosen for the MCU is adequate, and power is available.
Wiring to Base Station locations has been pulled and correctly
terminated.
Phone lines for the SpectraLink 6000 Wireless Telephones are
installed and properly terminated.
Dedicated line is available for remote access to diagnostic modem.
Telephone system administrator is on-site to program the existing
telephone system.
If the work has not been completed, the Polycom field service
engineer can leave the site and reschedule the installation when the
items have been completed or corrected, or assist in preparing the
site.