A SERVICE OF

logo

3. Remove the old separation pad.
4. Install the new ADF roller assembly.
5. Install the new separation pad.
6. Close the operation panel.
USER MAINTENANCE PROCEDURES LOOKING AFTER THE MACHINE
146