A SERVICE OF

logo

Installation
Outdoor Scoreboards
Your scoreboard will require a 120 VAC, 60 Hz, grounded electrical feed. Typically the feed will be a dedicated 20
Amp circuit. Optional 230VAC, 60Hz, is also available. Refer to the model specifi c information provided in this
package for the exact current load for your scoreboard. FIGURE 2 illustrates a generic installation including a con-
troller. CDS recommends using ONLY grounded metal conduit. Seek the service of a qualifi ed electrician to ensure
the electrical installation meets all local electrical codes. CDS assumes no responsibilities for installations done by
others. Data cabling for the scoreboard is available as a kit for installation with the grounded conduit (connectors
installed on site). See the DATA CABLING for more information.
Pole mounting is the preferred method of installation. Seek the service of a qualifi ed contractor to ensure the struc-
scoreboard is shipped with mounting brackets which will require installation prior to mounting the scoreboard. All
necessary hardware required to mount the brackets to the scoreboard is provided with your new scoreboard. Lift-
ing eyebolts are provided on the top of the scoreboard to facilitate lifting of the unit to its fi nal installation location.
suitable for the type of construction and have suffi cient capacity to support the scoreboard. CDS recommends using
½”, grade 8 fasteners. Detailed information regarding mounting locations and fastener recommendations for your
scoreboard model is provided in the documentation attached.
INSTRUCTIONS
1551 E 11th Street, Loveland, CO 80537 • 970-667-1000 • Fax: 970-667-1032 • www.coloradotime.com
CD