![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/a/9e/a9ef0807-d579-4e58-b696-fd0c3caa7115/a9ef0807-d579-4e58-b696-fd0c3caa7115-bg4.png)
Contents
iv Issue 1 September 1995
Generic 3 Management Terminal
(G3-MT) Requirements 2-2
Cross-Connect Fields 2-2
Space Requirements 2-2
Room Layout 2-2
Figure Notes: 2-3
Cable Slack Manager (Optional) Requirements 2-4
Tools Needed 2-4
Lay Out and Ensure Appropriate Power 2-6
Power Arrangements for AC Power 2-6
Power Arrangements for DC Power 2-7
■ Lay Out and Ensure Appropriate Grounding 2-8
Connect Coupled Bonding Conductor 2-8
■ Determine the Location of the Equipment Closets 2-9
■ Determine External Trunk Locations 2-9
■ Create a Provisioning Plan 2-9
3 Unpack the Cabinet 3-1
Unpack and Inspect for Damage 3-1
4 Install and Connect the Cabinets 4-1
■ Install Earthquake Mounting 4-2
■ Position and Stack the Cabinets 4-2
■ Connect System Cabinet Grounds 4-3
Figure Notes: 4-4
■ Connect Battery Leads 4-5
■ Connect Power 4-6
Connect AC Power 4-6
Connect DC Power 4-6
Figure Notes: 4-8
Connect Power Plant Ground 4-9
Figure Notes: 4-9
Connect Frame Ground 4-10
Figure Notes: 4-10
Connect DC Power Distribution Box Grounding 4-11