![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/3/fa/3faa8d70-61c8-4cdf-abec-7ddab7cc9af5/3faa8d70-61c8-4cdf-abec-7ddab7cc9af5-bg3e.png)
4-1
ProLiant 3000 Setup and Installation Guide
Writer: Tom Erber Project: ProLiant 3000 Setup and Installation Guide Comments: 296908-002
File Name: E-CH04.DOC Last Saved On: 1/27/98 4:20 PM
COMPAQ CONFIDENTIAL - NEED TO KNOW REQUIRED
Chapter 4
Installing Hardware Options
This chapter is divided into two major parts as follows:
■ Accessing Non Hot-Plug Areas - you must shut down the server power
in order to install options, upgrades or replacements in the following
areas:
❏ Processor boards and sockets
❏ Memory board and sockets
❏ System Board
❏ Drive Cage Backplane Board
❏ Power Supply Backplane Board
❏ Three shared PCI/EISA slots
❏ Five PCI slots
❏ Fans
■ Accessing Hot-Plug Areas - you can install hot-plug options, upgrades
or replacements without shutting down the power in the following areas:
❏ SCSI drive bays
❏ Power supplies
NOTE: The illustrations in this chapter may vary slightly depending on whether
you have a tower model or rack model.