A SERVICE OF

logo

10
Installation
36" Island Vent Hood
Wiring
• Route house wiring through the ceiling hole
and pull a length to reach the hood junction
box, approximately 6” below the support.
• Tape the wire to the front of the frame
support to prevent damage during installa-
tion and service.
7
Step
Size And
Install
Ductwork
To Find Required Duct Length:
• Measure from house duct flange to bottom
of support frame. (Dimension A)
– Add at least 1” to Dim. A for duct overlap at
the top.
– Subtract 1-3/4” for hood insertion into the
bottom of the frame to determine required
duct length.
• Cut the 6” duct to required length.
Note: The bottom of the duct must be external
(female) connection to the top of the hood.
The bottom end should be flared slightly, to
facilitate installation of the hood.
• Install duct up through support frames and
attach to house ducting with sheet metal
screws.
• Seal the connection with duct tape.
Secure
Wiring
Step
6
Ceiling
Support
Frames
Tape
House
Wiring
Front Side
Ceiling
Duct
Dim. A
Duct Connection
To Hood
Bottom Support
Frame Flange
House Duct
1-3/4"
Side
View
Support
Frame
Required
Duct
Length