A SERVICE OF

logo

84 HP ProLiant DL385 Server User Guide
7. Install the expansion board.
8. Lock the PCI retaining clip.
9. Install the PCI riser cage ("Installing the PCI riser cage" on page 41
) if you
installed the expansion board in slot 3.
10. Connect any required internal or external cables to the expansion board.
Refer to the documentation that ships with the expansion board for details.
11. Close the PCI riser cage door.
12. Install the access panel ("Installing the access panel" on page 39
).
13. Power up the server ("Powering up the server" on page 35
).