14
7
STEP
• Begin routing cable #6 with the end
opposite the steel ball end. Feed the
cable over pulley R, under S, around
T, and under U. Unscrew the nut from
the slotted bolt (M12). With the
threads of the bolt facing up, slide
cable #6 through it and reattach the
nut. Thread the bolt into the post of
pulley V, just enough so the cable
won’t fall out. Slip the opposite end of
the cable (ball end fitting) through the
wide opening, on the side of the U
bracket. Place the U bracket over the
cable receptor attachment point on
the main floor support (1b). Line up
the holes and slide the shoulder bolt
(15x33L) through the 3 holes. Attach
a spring (SW10.2x18.4x2.5T) and
flat (10.5x18x2T) washer and nut
(M10x1.5P) using a 6mm L-shaped
wrench and a 17mm wrench. Tighten
until the end of the bolt protrudes
beyond the end of the nut. Do not
crush the U bracket.
BLACK BAG
WARNING:
FAILURE TO PROPERLY
COMPLETE THIS STEP COULD RESULT
IN SERIOUS INJURY!
• Go back up and tighten the slotted
bolt (M12), until the cable is taught (a
minimum of 0.5”). Tighten both the
bolt and the locking nut using a
19mm wrench.
NOTE: With the weight selector pin
engaged in the 10 pound hole, pull
on all three cable ends. There should
be no more than 0.5” of play in the
cable. This means that the 10 pound
weight should begin to move vertically,
within 0.5” of cable pull. If there is
more distance than this, tighten the
appropriate bolts until you achieve
0.5” or less. If you over tighten, the
weight selector pin won’t fit easily in
the rod that accommodates the
weight stack.