VGZ-018 / 0805.1 NORSEMAN™ 1500/2500 FURNACE / Page 7
LOCATING FURNACE continued…
Fig. 3 – Minimum Plenum Clearances from Combustible Materials
CAUTION: KEEP FURNISHINGS
AND OTHER COMBUSTIBLE
MATERIALS AWAY FROM THE
FURNACE.
TOOLS & MATERIALS REQUIRED FOR ASSEMBLY
AND INSTALLATION
TOOLS REQUIRED
Safety Glasses
Gloves
Pencil
6 ft. Tape Measure
Tin Snips
Sabre Saw
Drill
1/8” dia. Drill Bit (for sheet metal screws)
Screwdrivers (Phillips & slotted)
6mm Socket with Driver
10mm Socket with Driver
10mm open end box wrench
7/16” box wrench
MATERIALS REQUIRED
NOTE: The following items are NOT included with
your furnace.
Chimney Connection:
6” black steel (24 ga. min.) straight furnace pipe,
elbow, Collar and Thimble (as required).
6˝ Barometric Draft Regulator (optional)
8˝ Round Butterfly Anti-Backdraft Damper
(2 required – for parallel installation only)
Plenum & Duct Work (as required).
Chimney: Existing 6” Lined Masonry Chimney
or 6” Inside Dia. Listed Type HT chimney.
1/2” Sheet Metal Screws
Electr ical Wiring : 18 ga. AWG c opper wi th
90° C min.
1/2˝ Conduit & Connectors
Furnace Cement (manufacturer recommends Rutland
Code 78 or equivalent)
N O T E : B E F O R E F I R I N G
FURNACE, SLIDE FIREBRICKS
TOWARDS REAR SO NO GAPS
REMAIN BETWEEN BRICKS. DO
NOT OPERATE FURNACE WITH
CRACKED OR MISSING FIRE
BRICKS.