![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/0/78/07847d32-0abf-4fda-a0e3-2d3a21fbd4ac/07847d32-0abf-4fda-a0e3-2d3a21fbd4ac-bg43.png)
Preparation and Unpacking 2-11
Installing the PathBuilder S24x, 26x, and 27x Switch in an Equipment Rack
Steps for
Rackmount
Assembly
Figure 2-3 shows the steps for rackmount assembly.
Figure 2-3. PathBuilder S24x, 26x, and 27x Switch Rackmount Assem-
bly
10-32 x .38
Screws
Insert the Mounting Shelf in the desired
location and secure it to the front rail using
four 12-24 x .50 screws supplied with your
equipment rack.
Fasten the adjustable Rear Mounting brackets
to each side of the equipment rack using four
12-24 x .50 screws.
Bolt the Mounting Shelf to the Rear Mounting
Brackets using the four 10-32 x .38 screws supplied
with the kit. Do this by inserting the screws from
inside the rack, through the Mounting Shelf slot, and
through the appropriate hole in the
Rear Mounting bracket.
A
B
C
Adjustable Rear Mounting bracket
Mounting Shelf
Equipment Rack Rail