Common Systems Connection Standards AT&T Services, Inc
Date: August 31, 2007 ATT-TP-76450, Issue 9
Copyright ©2004 – 2006, AT&T Knowledge Ventures
All rights reserved
Page 22
Documentation must be provided in both PDF and HTML format on a CD that is fully
indexed and fully searchable.
7.2 Hard Copy Documentation
Documentation must be furnished in paper copy on request.
7.3 Craft Interface Instructions
Documents must provide step by step instructions for each procedure using Craft GUI, EMS
GUI, and TL1 (preferred) or equivalent commands.
Note: Items 7.4 and 7.5 Extend the testing procedure in GR-2914-CORE 20.8 Test Method for
Documentation Comprehension to include the complete “Installation Guide
7.4 Installation Guide: installation, provisioning, and testing of the network element
Vendor must test and validate that a new user can successfully install, provision, and test the
network element by following the “Installation Guide”.
7.5 Installation Guide: Creation, provisioning, and testing of a multi-node ring or
system
Vendor must test and validate that a new user can successfully create, provision, and test a
multi-node ring or system by following the “Installation Guide”.
7.6 Alarm/Trouble Shooting Guide
Vendor must test and validate that a new user can use the Alarm or Trouble Shooting guide to
successfully identify and clear alarms
7.7 Personnel Injury and Equipment Damage Warnings
Documentation must keep the user aware of personnel injury and equipment damage by using
the appropriate warnings, dangers, or cautions preceding procedures and incorporating the
appropriate steps within the procedures.
7.8 Reference Guide
Documentation must include a “Reference” guide that describes each component of the NE in
detail
Example: Photographs or detailed drawings of the faceplates of each plug-in with a description
of the LEDs in a normal state and in an alarm or other informational state, optical connection
type, if applicable, power requirements , etc