A SERVICE OF

logo

3 - 4 Document #98210104
Step 9
Install the two rail clamps with the 3/8” bolts and
spacers.. Once the bolts are tight, roll the dyno back
and forth to ensure the rail clamps are not binding.
Step 10
Secure the cable carrier to the rail tie with two
1/4” button head screws and lock washers.
Note: Move the Rail Clamps up and down to
ensure that they are free to move. If the
clamps are binding ,you will need to loosen
the allen head bolts. Be sure to add thread
lock to ensure that the bolts are secure.