![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/d/e4/de4fdaf2-3482-4f42-914d-073185cbfb06/de4fdaf2-3482-4f42-914d-073185cbfb06-bg4.png)
4
Installation Instructions
This quick start guide provides procedures for installing and configuring your new QLogic iSR6200 router.
■ Step 1. Verify the package contents.
■ Step 2. Complete the pre-installation checklist.
■ Step 3. Mount the router.
■ Step 4. As needed, insert additional blade into router.
■ Step 5. Install the small form factor pluggable (SFP) transceivers.
■ Step 6. Apply power to the router.
■ Step 7. Download and install SANsurfer
®
Router Manager
■ Step 8. Configure the iSR6200 management port IP address.
■ Step 9. Present LUNs to iSCSI initiators.
■ Step 10. Configure second blade (if provided).
■ Step 11. Configure an FCIP route
■ Step 12. Locate the blade serial number for the license key activation.
Step 1. Verify the Package Contents
Verify the contents of the purchased production package, either C12 or B10.
The iSR6200 router production package (C12) includes the following hardware components:
■ iSR6200 router chassis with two blades installed
■ DB9 to RJ45 cable adapter
■ Power cable (6 foot black)
■ Rail Mounting Kit, part number 50990-00
■ WEEE Conformance card
■ Read Me First card
■ China RoHs Electronic Info, RoHs Switch/Power/Fan SKUs Toxic Substance (Chinese Vers) 20 Years
■ iSR6200 Quick Start Guide (this document)
The standalone blade production package (B10) includes the following hardware components:
■ One blade
■ SFPs
■ WEEE Conformance card
■ Read Me First card
■ China RoHs Electronic Info, RoHs Switch/Power/Fan SKUs Toxic Substance (Chinese Vers) 20 Years
■ iSR6200 Quick Start Guide (this document)