A SERVICE OF

logo

22
Included with this instruction packet are separate User Manuals on each
major operating component of the tower, and it is recommended that you
read them thoroughly. Where discrepancies may exist, the separate User
Manuals will take precedence.
The following is recommended as a minimum routine of scheduled main-
tenance:
Always shut off electrical power to the tower fan motor prior to
performing any inspections that may involve physical contact with
themechanicalorelectricalequipmentinoronthetower.Lockout
and tag out any electrical switches to prevent others from turning
thepowerbackon.Servicepersonnelmustwearproperpersonal
protectiveclothingandequipment.
Weekly: Inspect for bacterial growth and general operation conditions.
Bacterial growth should be reported to your water treatment expert for
immediate attention.
Monthly (Weekly at start up): Observe, touch, and listen to the fluid
cooler. Become accustomed to its normal appearance, sound, and level of
vibration. Abnormal aspects relating to the rotating equipment should be
considered reason to shut down the fluid cooler until the problem can be
located and corrected. Observe operation of the motor and fan. Become
familiar with the normal operating temperature of the motor(s), as well as
the sight and sound of all components as a whole.
Inspect drift eliminators and basin trash screens and remove any debris
or scale which may have accumulated. Replace any damaged or worn
out components. Use of high-pressure water may damage the eliminator
material.
Observeoperationoftheoatvalve.Depresstheoperatinglevertomake
sure that the valve is operating freely. Inspect the suction screen for plug-
ging. Remove any debris that may have accumulated.
Check for any buildup of silt on the floor of the collection basin. Mentally
make note of the amount, if any, so future inspections will enable you to
determine the rate at which it is forming.
Every 3 months: Lubricate fan shaft bearings. While rotating equipment
by hand, grease the bearings until a bead forms around the seals—a
maximumchargeof12mLisrecommended.MobilSHC460greaseis
recommended.
Maintenance
Warning