A SERVICE OF

logo

Contents
Installing the Control Unit,
Continued
Installing Expansion Carriers
2-27
Installing the Processor
2-29
Installing the Modules
2-32
Replacing a Module
2-40
Connecting the Control Unit to an AC Outlet
2-43
Powering Up the System
2-44
Powering Down the System
2-45
3
Installing Telephones and Adjuncts
Installing Multi-Function Modules
3-1
Installing Adjuncts
3-22
Installing Direct Station Selectors
3-43
Assembling MLX Telephones
3-48
Installing Cordless or Cordless/Wireless Telephones
3-57
Connecting Telephones to the Control Unit
3-58
4
Connecting the Control Unit to the Network Interface
Wiring
4-2
Testing Trunks
4-12
Labeling Trunks
4-14
Installing the Channel Service Unit
4-14
iv Installation