A SERVICE OF

logo

BMC Software, Inc., Confidential and Proprietary Information
206 Application Enhancement Solutions Messages Manual
BMC74252E CLOSE OF DB2 CALL TRACE DATA SET WAS NOT SUCCESSFUL.
DATA SET STATUS IS status.
Explanation: APPLICATION RESTART CONTROL (AR/CTL)
for DB2*
attempted to close the DB2 call trace data set. The attempt was not successful. The
DB2 call trace data set has the given status.
System Action: AR/CTL abnormally terminates the task with abend U1771 and
reason code X00074252.
User Response: The dynamic allocation skeleton probably contains an error.
Review the JES message log, and review the Dynamic Allocation Parameter List
report (found under ddname ARCDYNPR). Take corrective action as indicated by
messages and the Dynamic Allocation Parameter List report.
BMC74253E AN INPUT/OUTPUT ERROR OCCURRED ON THE DB2 CALL TRACE
DATA SET. THE DB2 CALL TRACE IS DISABLED.
Explanation: APPLICATION RESTART CONTROL (AR/CTL)
for DB2*
intercepted an I/O error on the application program DB2 call trace data set.
System Action: Processing continues, but the DB2 call trace will be disabled for
the remainder of the execution of the current task.
User Response: The dynamic allocation skeleton probably contains an error.
Review the JES message log, and review the Dynamic Allocation Parameter List
report (found under ddname ARCDYNPR). Take corrective action as indicated by
messages and the Dynamic Allocation Parameter List report.
BMC74254E TEMPORARY CLOSE OF DB2 CALL TRACE DATA SET RETURNED
CODE rc. DATA SET STATUS IS status.
Explanation: APPLICATION RESTART CONTROL (AR/CTL) attempted to
temporarily close the DB2 call trace data set. The attempt failed, and AR/CTL
received return code rc. The trace data set has the given status.
System Action: AR/CTL abnormally terminates the task with abend U1771 and
reason code X00074254.
User Response: The dynamic allocation skeleton probably contains an error.
Review the JES message log, and review the Dynamic Allocation Parameter List
report (found under ddname ARCDYNPR). Take corrective action as indicated by
messages and the Dynamic Allocation Parameter List report.