Mobile Base Installation Guide
CHAPTER 1
Installation
1-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
INSTALLATION
You will need to provide equipment capable of lifting a minimum of 1600 lb (725 kg)
to lift the dyno. You will also need a pair of straps capable of supporting the weight of
the dyno. Several types of straps or chains can be used to lift the dyno; Dynojet
recommends using a continuous nylon loop style strap.
MOVING THE DYNO TO THE MOBILE BASE FRAME
1 Place the mobile base frame on blocks as shown in Figure 1-6. The blocks need to
raise the base frame at least four inches off the floor.
Figure 1-6: Place the Mobile Base Frame on Blocks
2 Using a fork lift and nylon loop straps, move the dyno onto the mobile base
frame. Do not put the full weight of the dyno onto the frame until step 4.
Figure 1-7: Place the Dyno on the Mobile Base Frame