A SERVICE OF

logo

Microplate Luminometer Installation and Commissioning
25
The tubings leading to the injector unit must be installed at
the foreseen place (rubber foam) so that the door is pressed
into the rubber foam.
Align the service door exactly.
Press the service door down firmly on the right hand side.
Connect the MONOLIGHT 3096 and the injector unit using the
supplied cable. Insert the 15-pin connector into the MPL port
in the injector unit.
Power switch Power cord Operating MPL port
voltage indicator
0
I
Check that the wall outlet voltage matches the operating
voltage labeled on the injector unit. If not, change the oper-
ating voltage as described in section 8.14.
Connect the injector unit to the wall outlet using the supplied
power cable.
CAUTION: Always turn the luminometer on first, then wait for
at least 20 seconds before turning on the injector unit.
To stabilize reagent bottles, you may use the supplied rea-
gent bottle holders made of stainless steel.
Figure 3-5:
Rear panel of
injector unit
connector